1200 1200c M100 M300 User Manual
Page 5: Static elimination speed and operating distance, Operation time vs. operating distance, Operating area and operation time
- 1200 1200c M100 M300 User Manual Pdf
- 1200 1200c M100 M300 User Manual Free
- 1200 1200c M100 M300 User Manual Diagram
4
2-1
Before Installation
Compaq Presario,Presario 1200-XL118 Manuals & User Guides. User Manuals, Guides and Specifications for your Compaq Presario,Presario 1200-XL118 Laptop. Database contains 1 Compaq Presario,Presario 1200-XL118 Manuals (available for free online viewing or downloading in PDF): Supplementary manual. Search on the page: Ctrl+F (enter the name of the firm or digital value of the model) SAMSUNG AUDIO SCHEMATIC DIAGRAMS AND SERVICE MANUALS. SANSUI AUDIO SCHEMATIC DIAGRAMS AND SERVICE MANUALS. SANYO AUDIO SCHEMATIC DIAGRAMS AND SERVICE MANUALS.
This section describes the static elimination performance of the SJ-M100/200 Series.
Before you install the SJ-M100/200 Series, fully calculate the distance between the Static Elimination
Head up to the target object and the time required for static elimination.
About Static Elimination Performance
■ Static elimination speed and operating distance
The SJ-R Series offers a variety of frequency settings to enable flexible static elimination according to
the location and application.
See 'Frequency setting' (page 6).
The following graphs show typical examples of the relationship of static elimination speed, operating
distance, and frequency settings for the SJ-R Series. Use the graphs to select the appropriate static
elimination setting.
■ Operation time vs. operating distance
Static elmination
speed
Location
Operating
distance(mm)
Recommended
frequency (Hz)
High-speed
Low-speed
Production lines of films or sheets
(Short distance)
50–300
50, 30
Clean bench (Middle distance)
300–1000
10, 8, 5
On ceiling of clean room (Long distance)
1000–2000
3, 1
Model: SJ-M030/030C
Measurement conditions:
The time required to eliminate the static charge of the
target from ±3000 V to ±300 V is measured.
The 150 x 150 mm plate monitor (20pF) is used.
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The 150 x 150 mm plate monitor (20pF) is used.
Under the downward air flow of 0.3 m/sec.
Model: SJ-M070/070C
50Hz
30Hz
25
20
15
10
5
30
Char
g
ed level (V)
Time (secs)
0
0
50
100
150
200
250
300
8Hz
5Hz
1Hz
50
60
40
30
20
10
0
0
400
600
800 1000 1200 1400 1600
200
Char
g
ed level (V)
Time (secs)
0
2
4
6
8
10
12
14
16
18
20
0
50
100
150
200
250
300
Operating distance (mm)
Operatin
g
time (sec.)
50Hz
30Hz
0
5
10
15
20
25
30
35
0
200
400
600
800 1000 1200 1400 1600
Operating distance (mm)
Operatin
g
time (sec.)
Cannon caress gas fire user manual. They are available as radiant fires, LFE living flame effect and in recent years you can get a variety of fake fuel beds such as coals, pebbles and wood.Manufacturers include Baxi, Valor, Main, CFM, Kinder, Verine, Focal Point, Robinson Willey, Flavel, Cannon, Potterton, Charnwood, Paragon and Charlton Jenrick.It is important to take your time to find the right Fire spare for your job. We have a large range in stock at DHS and if you are unsure please give us a call. Fires are generally used to heat one room in a house and are available in a variety of fuels sources such as electric, lpg, natural gas and solid fuel.
8Hz
5Hz
1Hz
2-1
Before Installation
Measurement conditions:
The time required to eliminate the static charge of the
target from ±3000 V to ±300 V is measured.
The 150 x 150 mm plate monitor (20pF) is used.
The downward air flow of 0 m/sec
3 NL/min (1 electrode) air purge
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The 150 x 150 mm plate monitor (20pF) is used.
Under the downward air flow of 0.3 m/sec.
3 NL/min (1 electrode) air purge
Model: SJ-M030G
Model: SJ-M070G
50Hz
30Hz
4
3
2
0
0
1
50
100
150
200
250
300
3.5
2.5
1.5
0.5
Operatin
g
time (sec.)
Operating distance (mm)
8Hz
5Hz
1Hz
25
30
20
15
10
5
0
0
400
600
800 1000 1200 1400 1600
200
Char
g
ed level (V)
Time (secs)
0
0.5
1
1.5
2
2.5
3
3.5
4
0
50
100
150
200
250
300
Operating distance (mm)
Operatin
g
time (sec.)
50Hz
30Hz
0
2
4
6
8
10
12
14
16
0
200
400
600
800 1000 1200 1400 1600
Operating distance (mm)
Operatin
g
time (sec.)
8Hz
5Hz
1Hz
Measurement conditions:
The time required to eliminate the static charge of the
target from ±3000 V to ±300 V is measured.
The 150 x 150 mm plate monitor (20pF) is used.
The downward air flow of 0 m/sec
1 NL/min (1 electrode) air purge
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The 150 x 150 mm plate monitor (20pF) is used.
Under the downward air flow of 0.3 m/sec.
1 NL/min (1 electrode) air purge
Model: SJ-M030V/030VC
Model: SJ-M070V/070VC
50Hz
30Hz
20
18
16
14
12
10
8
6
4
2
0
0
50
100
150
200
250
300
Char
g
ed le
v
el (V)
Time (secs)
8Hz
5Hz
1Hz
50
60
40
30
20
10
0
0
400
600
800 1000 1200 1400 1600
200
Char
g
ed level (V)
Time (secs)
0
2
4
6
8
10
12
14
16
18
20
0
50
100
150
200
250
300
Operating distance (mm)
Operatin
g
time (sec.)
50Hz
30Hz
0
10
20
30
40
50
60
0
200
400
600
800 1000 1200 1400 1600
Operating distance (mm)
Operatin
g
time (sec.)
8Hz
5Hz
1Hz
2-1
Before Installation
■ Operating area and operation time
The following graphs show typical examples of the relationship between the time required to eliminate
the target's static charge and the operating distance from the target to the static elimination bar.
Use the graphs to select the appropriate static elimination setting.
1200 1200c M100 M300 User Manual Pdf
Model: SJ-M030/030C
At the time of frequency 50 Hz
Model: SJ-M070/070C
At the time of frequency 50 Hz
Measurement conditions:
The time required to eliminate the static charge of the
target from ±3000 V to ±300 V is measured.
The downward air flow: 0 m/sec
The air purge: 0
NL/min
Measurement conditions:
The time required to eliminate the static charge of the
target from ±3000 V to ±300 V is measured.
The downward air flow: 0 m/sec
The air purge: 0
NL/min
At the time of frequency 8 Hz
At the time of frequency 8 Hz
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge: 0
NL/min
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge: 0
NL/min
At the time of frequency 1 Hz
At the time of frequency 1 Hz
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge: 0
NL/min
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge: 0
NL/min
50
100
150
50
100
150mm
50
100 150mm
0.4sec
0.6sec
0.8sec
1.2sec
1.5sec
50
100
150
50
100
150mm
50
100 150mm
0.4sec
0.6sec
0.8sec
1.2sec
1.5sec
150
300
450
300
600
900mm
150 300 450mm
5sec
10sec
15sec
30sec
150
300
450
300
600
900mm
150 300 450mm
5sec
10sec
15sec
20sec
300
450
600
150
450
300
150
600mm
300
600
900
1200
1500mm
4sec
20sec
30sec
300
450
600
150
450
300
150
600mm
300
600
900
1200
1500mm
4sec
10sec
20sec
2-1
Before Installation
Model: SJ-M030G
At the time of frequency 50 Hz
Model: SJ-M070G
At the time of frequency 50 Hz
Measurement conditions:
The time required to eliminate the static charge of the
target from ±3000 V to ±300 V is measured.
The downward air flow: 0 m/sec
The air purge:
3 NL/min (1 electrode)
Measurement conditions:
The time required to eliminate the static charge of the
target from ±3000 V to ±300 V is measured.
The downward air flow: 0 m/sec
The air purge:
3 NL/min (1 electrode)
At the time of frequency 8 Hz
At the time of frequency 8 Hz
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge:
3 NL/min (1 electrode)
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge:
3 NL/min (1 electrode)
At the time of frequency 1 Hz
At the time of frequency 1 Hz
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge:
3 NL/min (1 electrode)
Measurement conditions:
The time required to eliminate the static charge of the
target from ±5000 V to ±500 V is measured.
The downward air flow: 0.3 m/sec
The air purge:
3 NL/min (1 electrode)
50
100
150
50
100
150mm
50
100 150mm
0.4sec
0.8sec
0.6sec
1.0sec
50
100
150
50
100
150mm
50
100 150mm
0.4sec
0.6sec
0.8sec
50
100
Duringthe first 30 days of purchase, there will be no charges to service the product at yourhome for issues covered by this warranty. This charge will be waived if the Craftsman product isdropped off at an authorized Sears location.
For your conve nience, IN HOME warranty service will still be available after the first 30 days of pur chase, but a trip charge will apply. Sears will also provide free labor for these applicable warranted parts for the two full years. (See exclusions below).
150
50
100
150mm
50
100 150mm
5sec
15sec
10sec
50
100
150
50
100
150mm
50
100 150mm
5sec
15sec
10sec
300
450
600
150
450
300
150
600mm
300
600
900
1200
1500mm
20sec
10sec
6sec
4sec
1200 1200c M100 M300 User Manual Free
300
450
600
150
1200 1200c M100 M300 User Manual Diagram
450
300
150
600mm
300
600
900
1200
1500mm
4sec
10sec
20sec
6sec